Breakwater design 2010
Attached Files:
Councillor_Contact_Page_2011Contact Details for East Gippsland Councillors
Background InformationSummary of how the Brumby government ignored expert Panels in the attempt to secure Ingram vote in event of hung parliament
DoT FOI BSFPDepartment of Transport FOI -panel assessment of Breakwater development funding under Boating Safety and Facilities Program
DoT FOI financial informationDepartment of Transport FOI emails on financing breakwater development
DoT FOI Governance, Native TitleFOI files from Department of Transport on Governance of Breakwater facility and Native Title issues
DoT FOI MPV Project teamFOI from Department of Transport with details of design and construction teams under Major Projects Victoria
DoT FOI BSFP Application LRFull application for funding under Boating Safety and Facilities Program, and how Minister Pallas overrode findings
101220 Revised economics one pager10 point analysis of shortcomings of the revised (Nov 2010) Buchan economic analysis
CMA Application EG Shire application for consent under Coastal Management Act
MSV funding application Aug 2010Application from EGSC to Dept Transport (formerly MSV) for capital funding
RDV Funding Application Oct 2010Grant application from EGSC to Regional Development Victoria for capital funding
EcoLarge 25 Nov 2010Economists at Large review of 14 Nov 2010 (second edition) of Buchan Economic Impact Statement
BASTION AD_no3-Melb Times.aiAdvertisement in Melbourne Times 24 November 2010
BASTION AD -2e FINAL- Bairnsdale.aiAdvertisement for East Gippsland News 24 Nov 2010
Buchan Rev 14 Nov 2010Revised Buchan report after correcting for $2.8 million calculation mistake
East Gippsland Shire Council - CONSULTANTS REVISE BP ECONOMICSEast Gippsland Shire Council Media Release on Buchan admitting to incorrect report
Melbourne Times 27 Oct 2010Advertisement
Buchan Consulting 2007 - Gippsland FloodsEconomic Impact Assessment of Gippsland Floods by Buchan Consulting 2007, showing use of Tourism Victoria expenditure of $90 per person per night (compared to $210 per night for Bastion Pt)
Economics Advertisement Advertisement placed in Bairnsdale Advertiser 11 October 2010
Economics one pagerDescribes in one page all the limitations of the Buchan Economic Impact Assessment Report
$50 of foodHow much food you could eat for $50
Annotated Buchan ReportResponse by SBPC to Buchan Report, using red annotations on pdf
Buchan Economic Impact AssessmentEconomic Impact Assessment by Buchan Consulting Pty Ltd
Economists at Large review of Buchan reportThis review from economists Economists at Large shows serious problems with the Buchan report methodology and conclusions
SBPC analysis of AMCS studyTwo page SBPC analysis of important issues arising from AMCS safety study
Comparison 3b with SBPC ConceptTable prepared by SBPC to compare merits of alternative concept with Option 3b
MSV risk audit safety responseCouncil response, prepared by Crossco, to audit prepared by AMCS Ltd
Operational management planWeekly and monthly inspections required for 3b facility
BP agenda 3 aug 2010Bastion Point agenda item for Council meeting of 3 August 2010
AMCSStudy of safety of breakwater option 3b conducted by AMCS Ltd for Marine Safety Victoria
Dredge plan drawingPlan of dredging outfall location
1579 landscape-colour'Landscape plan' for carpark and breakwater
1579 drawing set-revision BEngineering drawings of breakwater
RDV application finalFunding application from Regional Development Victoria for design work
MOABRCAC ToRDescribes the Terms of Reference of the 'community advisory group' working on breakwater design for submission to Council and Minister Jennings